Beijing–Hong Kong (Taipei) corridor 京港(台)通道
The Beijing–Hong Kong (Taipei) corridor (京港(台)通道) is one of the eight north–south corridors of China's 8+8 high-speed rail grid, the sixteen corridors laid down in the Medium- and Long-Term Railway Network Plan of 2016. In the plan it runs Beijing–Hengshui–Heze–Shangqiu–Fuyang–Hefei (Huanggang)–Jiujiang–Nanchang–Ganzhou–Shenzhen–Hong Kong (Kowloon), with Hefei–Fuzhou–Taipei as a branch. 9 of its 10 sections are open: 3,742 km of track in OpenStreetMap (1 open stretch not measured); 1 planned. Hub cities along it: Beijing, Hefei, Anqing, Jiujiang, Nanchang, Ji'an, Ganzhou, Huizhou, Shenzhen, Hong Kong, Huangshan City, Wuyuan, Shangrao, Wuyishan, Fuzhou (Fujian), Fuzhou (Jiangxi) and Sanming.
The lines are drawn whole; a corridor may use only part of one. See the corridor on the full high-speed rail map, or all sixteen corridors.
The corridor in the plan
Medium- and Long-Term Railway Network Plan (中长期铁路网规划, 发改基础〔2016〕1536号), 13 July 2016: 北京~衡水~菏泽~商丘~阜阳~合肥(黄冈)~九江~南昌~赣州~深圳~香港(九龙), Beijing–Hengshui–Heze–Shangqiu–Fuyang–Hefei (Huanggang)–Jiujiang–Nanchang–Ganzhou–Shenzhen–Hong Kong (Kowloon). A second branch: 另一支线为合肥~福州~台北高速铁路,包括南昌~福州(莆田)铁路, Hefei–Fuzhou–Taipei.
The lines that make it up
Each stretch of the corridor with the line it runs on: its length along OpenStreetMap's track (for a line not in the data, the length its source gives), the speed (the design speed where a source states it, else the top speed OpenStreetMap records on the stretch), when it opened (a stretch of a longer line shows the years of its own track where OpenStreetMap dates 90 % of it, else the whole line's years, marked as such) and whether it is open, under construction or planned, each with its source. A line's page lists its stations in order.
| Stretch | Line | km | km/h | Opened | Status |
|---|---|---|---|---|---|
| Beijing – Xiong'an | Beijing–Xiong'an intercity railway 京雄城际线 | 91 | 350 | 2020 | open (OpenStreetMap, start_date of the track) |
| Xiong'an – Hefei | Beijing–Hong Kong high-speed railway 京港高速线 by way of Hengshui, Heze, Shangqiu and Fuyang | 931 | 350 | 2019–2026 | open (OpenStreetMap, start_date of the track) |
| Hefei – Jiujiang | Beijing–Hong Kong high-speed railway 京港高速线 by way of Anqing; the plan's alternative by Huanggang is not built | 352 | 300 | 2020–2021 | open (People's Daily (Anhui), 22 Dec 2020; Xinhua, 30 Dec 2021) |
| Jiujiang – Nanchang | Nanchang–Jiujiang intercity railway 昌九城际线 | 139 | 200 | 2013 | open (OpenStreetMap, start_date of the track) |
| Nanchang – Ganzhou | Beijing–Hong Kong high-speed railway 京港高速线 | 408 | 350 | 2019 | open (OpenStreetMap, start_date of the track) |
| Ganzhou – Shenzhen | Beijing–Hong Kong high-speed railway 京港高速线 | 423 | 300 | 2019–2026 the whole line's years | open (OpenStreetMap, start_date of the track) |
| Shenzhen – Hong Kong | Guangzhou–Shenzhen–Hong Kong high-speed railway 广深港高速线 the Hong Kong section opened in September 2018; the line's length is counted under the Beijing–Harbin and Beijing–Hong Kong–Macau corridor | – | 200 | 2018 | open (Xinhua (Liaison Office of the Central People's Government in Hong Kong), 23 Sep 2018) |
| Hefei – Fuzhou branch | Hefei–Fuzhou high-speed railway 合福高速线 | 851 | 300 | 2015 | open (Wikidata, 合福高速铁路 (date of official opening)) |
| Fuzhou – Taipei branch | the planned Fuzhou–Taipei link listed in the 2016 plan as a branch (另一支线为合肥~福州~台北高速铁路) | – | – | – | planned (Medium- and Long-Term Railway Network Plan, NDRC, 13 Jul 2016) |
| Nanchang – Fuzhou branch | Nanchang–Fuzhou railway 昌福线 by way of Putian, on the 200 km/h Nanchang–Fuzhou railway | 547 | 200 | 2013 | open (OpenStreetMap, start_date of the track) |
Hub cities along the corridor
The atlas's hub cities the plan names and those on the corridor's open lines, in order along it; a city the plan names is listed even where the stretch to it is not yet built.
Where does the Beijing–Hong Kong (Taipei) corridor run?
From Beijing to Hong Kong (Kowloon): in the 2016 plan it runs Beijing–Hengshui–Heze–Shangqiu–Fuyang–Hefei (Huanggang)–Jiujiang–Nanchang–Ganzhou–Shenzhen–Hong Kong (Kowloon), with Hefei–Fuzhou–Taipei as a branch.
How much of the Beijing–Hong Kong (Taipei) corridor is open?
9 of its 10 sections are open: 3,742 km of track in OpenStreetMap (1 open stretch not measured); 1 planned.
Which lines make up the Beijing–Hong Kong (Taipei) corridor?
Beijing–Xiong'an intercity railway, Beijing–Hong Kong high-speed railway, Nanchang–Jiujiang intercity railway, Guangzhou–Shenzhen–Hong Kong high-speed railway, Hefei–Fuzhou high-speed railway and Nanchang–Fuzhou railway. Still to come: the planned Fuzhou–Taipei link.
More
- All sixteen corridors of the 8+8 grid, and every line with a page.
- The China high-speed rail map: every line, the fastest train from any of 224 cities, and SVG and PNG downloads.
Sources: the corridors, their city strings, branches and the lines the plan keeps at lower speeds are from the Medium- and Long-Term Railway Network Plan (中长期铁路网规划, 发改基础〔2016〕1536号), National Development and Reform Commission, Ministry of Transport and China Railway Corporation, 13 July 2016, quoted as printed. Lines, their lengths and the stretches drawn are from OpenStreetMap (© OpenStreetMap contributors, ODbL; extract of October 2026), measured along the track that carries each line's operating name; a stretch not measured is left out of the open total, and a line not in the data is counted apart, at the length its source gives. Opening years, construction and plans are from the sources given in the table; a stretch with no report found shows no status.
Cite this page
- APA
- Atlas of China. (2026, October 31). Beijing–Hong Kong (Taipei) corridor: lines, cities and what is open. https://www.atlasofchina.com/maps/corridors/beijing-hong-kong-taipei/
- MLA
- “Beijing–Hong Kong (Taipei) corridor: lines, cities and what is open.” Atlas of China, 31 Oct. 2026, www.atlasofchina.com/maps/corridors/beijing-hong-kong-taipei/.