Atlas of ChinaAn illustrated travel map

Hohhot–Nanning corridor 呼南通道

The Hohhot–Nanning corridor (呼南通道) is one of the eight north–south corridors of China's 8+8 high-speed rail grid, the sixteen corridors laid down in the Medium- and Long-Term Railway Network Plan of 2016. In the plan it runs Hohhot–Datong–Taiyuan–Zhengzhou–Xiangyang–Changde–Yiyang–Shaoyang–Yongzhou–Guilin–Nanning. 10 of its 13 sections are open: 1,833 km of track in OpenStreetMap (1 open stretch not measured); 1 under construction; 2 with no report found. Hub cities along it: Hohhot, Ulanqab, Datong, Taiyuan, Changzhi, Jincheng, Zhengzhou, Nanyang, Xiangyang, Jingzhou, Changde, Shaoyang, Yongzhou, Guilin, Liuzhou and Nanning.

HohhotUlanqabDatongTaiyuanChangzhiJinchengZhengzhouNanyangXiangyangJingzhouChangdeShaoyangYongzhouGuilinLiuzhouNanningHohhotDatongTaiyuanChangzhiJinchengZhengzhouNanyangXiangyangJingzhouChangdeShaoyangYongzhouGuilinLiuzhouNanning

The lines are drawn whole; a corridor may use only part of one. See the corridor on the full high-speed rail map, or all sixteen corridors.

The corridor in the plan

Medium- and Long-Term Railway Network Plan (中长期铁路网规划, 发改基础〔2016〕1536号), 13 July 2016: 呼和浩特~大同~太原~郑州~襄阳~常德~益阳~邵阳~永州~桂林~南宁, Hohhot–Datong–Taiyuan–Zhengzhou–Xiangyang–Changde–Yiyang–Shaoyang–Yongzhou–Guilin–Nanning.

The lines that make it up

Each stretch of the corridor with the line it runs on: its length along OpenStreetMap's track (for a line not in the data, the length its source gives), the speed (the design speed where a source states it, else the top speed OpenStreetMap records on the stretch), when it opened (a stretch of a longer line shows the years of its own track where OpenStreetMap dates 90 % of it, else the whole line's years, marked as such) and whether it is open, under construction or planned, each with its source. A line's page lists its stations in order.

StretchLinekmkm/hOpenedStatus
Hohhot – UlanqabBeijing–Baotou high-speed railway 京包客专线1262502017–2019open (OpenStreetMap, start_date of the track)
Ulanqab – DatongUlanqab–Datong high-speed railway 乌大高速线 the Jining–Datong–Yuanping line, opened 31 December 2024121250–open (Xinhua, 31 Dec 2024)
Datong – TaiyuanDatong–Xi'an high-speed railway 大西高速线 Taiyuan–Yuanping dated 2018 by OpenStreetMap; Yuanping–Datong opened on 31 December 2024 as part of the Ulanqab–Datong–Yuanping line. OpenStreetMap carries the Datong–Xi'an name from Huairen East; Datong–Huairen is tagged with the Ulanqab–Datong line's name2592502018–2024open (OpenStreetMap, start_date of the track; Xinhua, 31 Dec 2024)
Taiyuan – ZhengzhouZhengzhou–Taiyuan high-speed railway 郑太客专线4292502020open (OpenStreetMap, start_date of the track)
Zhengzhou – XiangyangZhengzhou–Chongqing high-speed railway 郑渝高速线3893502019open (OpenStreetMap, start_date of the track)
Xiangyang – JingmenXiangyang–Jingmen high-speed railway 襄荆高速线1183502025open (OpenStreetMap, start_date of the track; Xinhua, 29 Sep 2025)
Jingmen – JingzhouJingmen–Jingzhou high-speed railway 荆荆高速线773502024open (OpenStreetMap, start_date of the track)
Jingzhou – ChangdeJingzhou–Changde No line between the two is in the data.–––no report found
Changde – YiyangChongqing–Xiamen high-speed railway 渝厦高速线913502022open (OpenStreetMap, start_date of the track)
Yiyang – ShaoyangYiyang–Shaoyang No line between the two is in the data.–––no report found
Shaoyang – YongzhouShaoyang–Yongzhou high-speed railway 邵永高铁96 by its source350–under construction (Xinhua, 6 Jul 2025)
Yongzhou – LiuzhouHengyang–Liuzhou railway 衡柳线 by way of Guilin, on the 200 km/h Hengyang–Liuzhou railway; not measured–2002013open (People's Daily, 28 Dec 2013)
Liuzhou – NanningLiuzhou–Nanning high-speed railway 柳南客专线2232502013open (Wikidata, 柳南城际铁路 (date of official opening))

Hub cities along the corridor

The atlas's hub cities the plan names and those on the corridor's open lines, in order along it; a city the plan names is listed even where the stretch to it is not yet built.

Where does the Hohhot–Nanning corridor run?

From Hohhot to Nanning: in the 2016 plan it runs Hohhot–Datong–Taiyuan–Zhengzhou–Xiangyang–Changde–Yiyang–Shaoyang–Yongzhou–Guilin–Nanning.

How much of the Hohhot–Nanning corridor is open?

10 of its 13 sections are open: 1,833 km of track in OpenStreetMap (1 open stretch not measured); 1 under construction; 2 with no report found.

Which lines make up the Hohhot–Nanning corridor?

Beijing–Baotou high-speed railway, Ulanqab–Datong high-speed railway, Datong–Xi'an high-speed railway, Zhengzhou–Taiyuan high-speed railway, Zhengzhou–Chongqing high-speed railway, Xiangyang–Jingmen high-speed railway, Jingmen–Jingzhou high-speed railway, Chongqing–Xiamen high-speed railway, Hengyang–Liuzhou railway and Liuzhou–Nanning high-speed railway. Still to come: Shaoyang–Yongzhou high-speed railway (under construction).

More

Sources: the corridors, their city strings, branches and the lines the plan keeps at lower speeds are from the Medium- and Long-Term Railway Network Plan (中长期铁路网规划, 发改基础〔2016〕1536号), National Development and Reform Commission, Ministry of Transport and China Railway Corporation, 13 July 2016, quoted as printed. Lines, their lengths and the stretches drawn are from OpenStreetMap (© OpenStreetMap contributors, ODbL; extract of October 2026), measured along the track that carries each line's operating name; a stretch not measured is left out of the open total, and a line not in the data is counted apart, at the length its source gives. Opening years, construction and plans are from the sources given in the table; a stretch with no report found shows no status.

Cite this page
APA
Atlas of China. (2026, October 31). Hohhot–Nanning corridor: lines, cities and what is open. https://www.atlasofchina.com/maps/corridors/hohhot-nanning/
MLA
“Hohhot–Nanning corridor: lines, cities and what is open.” Atlas of China, 31 Oct. 2026, www.atlasofchina.com/maps/corridors/hohhot-nanning/.