Coastal corridor 沿海通道
The Coastal corridor (沿海通道) is one of the eight north–south corridors of China's 8+8 high-speed rail grid, the sixteen corridors laid down in the Medium- and Long-Term Railway Network Plan of 2016. In the plan it runs Dalian (Dandong)–Qinhuangdao–Tianjin–Dongying–Weifang–Qingdao (Yantai)–Lianyungang–Yancheng–Nantong–Shanghai–Ningbo–Fuzhou–Xiamen–Shenzhen–Zhanjiang–Beihai (Fangchenggang). 13 of its 19 sections are open: 3,350 km of track in OpenStreetMap (1 open stretch not measured); 5 under construction; 1 with no report found. Hub cities along it: Dandong, Dalian, Qinhuangdao, Tangshan, Tianjin, Weifang, Qingdao, Yantai, Lianyungang, Yancheng, Nantong, Shanghai, Ningbo, Taizhou, Wenzhou, Ningde, Fuzhou (Fujian), Putian, Quanzhou, Xiamen, Chaozhou, Shenzhen, Jiangmen, Zhanjiang and Beihai.
The lines are drawn whole; a corridor may use only part of one. See the corridor on the full high-speed rail map, or all sixteen corridors.
The corridor in the plan
Medium- and Long-Term Railway Network Plan (中长期铁路网规划, 发改基础〔2016〕1536号), 13 July 2016: 大连(丹东)~秦皇岛~天津~东营~潍坊~青岛(烟台)~连云港~盐城~南通~上海~宁波~福州~厦门~深圳~湛江~北海(防城港), Dalian (Dandong)–Qinhuangdao–Tianjin–Dongying–Weifang–Qingdao (Yantai)–Lianyungang–Yancheng–Nantong–Shanghai–Ningbo–Fuzhou–Xiamen–Shenzhen–Zhanjiang–Beihai (Fangchenggang). The plan adds: 其中青岛至盐城段利用青连、连盐铁路,南通至上海段利用沪通铁路, Qingdao–Yancheng uses the Qingdao–Lianyungang and Lianyungang–Yancheng railways, Nantong–Shanghai the Shanghai–Nantong railway.
The lines that make it up
Each stretch of the corridor with the line it runs on: its length along OpenStreetMap's track (for a line not in the data, the length its source gives), the speed (the design speed where a source states it, else the top speed OpenStreetMap records on the stretch), when it opened (a stretch of a longer line shows the years of its own track where OpenStreetMap dates 90 % of it, else the whole line's years, marked as such) and whether it is open, under construction or planned, each with its source. A line's page lists its stations in order.
| Stretch | Line | km | km/h | Opened | Status |
|---|---|---|---|---|---|
| Dandong – Dalian | Dandong–Dalian railway 丹大线 | 292 | 200 | 2015 | open (Wikidata, 丹大铁路 (date of official opening)) |
| Dalian – Qinhuangdao | Dalian–Qinhuangdao No line round the Bohai gulf is in the data; trains run by way of Shenyang on the Shenyang–Dalian and Beijing–Harbin lines. | – | – | – | no report found |
| Qinhuangdao – Tianjin | Tianjin–Qinhuangdao high-speed railway 津秦高速线 | 266 | 350 | 2013 | open (Wikidata, 津秦高速铁路 (date of official opening)) |
| Tianjin – Weifang | Tianjin–Weifang high-speed railway 津潍高铁 by way of Dongying | 348.9 by its source | 350 | – | under construction (Xinhua, 1 Sep 2026; Tianjin Municipal Government, 16 Jan 2022) |
| Weifang – Qingdao | Jinan–Qingdao high-speed railway 济青高速线 | 96 | 300 | 2018 | open (OpenStreetMap, start_date of the track) |
| Weifang – Yantai branch | Weifang–Yantai high-speed railway 潍烟高速线 | 237 | 350 | 2024 | open (Wikidata, 津潍烟高速铁路 (date of official opening)) |
| Qingdao – Yancheng | Qingdao–Yancheng railway 青盐线 by way of Lianyungang, on the 200 km/h Qingdao–Yancheng railway the plan names | 427 | 200 | 2018 | open (OpenStreetMap, start_date of the track) |
| Yancheng – Nantong | Yancheng–Nantong high-speed railway 盐通高速线 | 159 | 350 | 2020 | open (OpenStreetMap, start_date of the track) |
| Nantong – Shanghai | Shanghai–Suzhou–Nantong railway 沪苏通线 the 200 km/h Shanghai–Nantong railway the plan names | 144 | 200 | 2020 | open (OpenStreetMap, start_date of the track) |
| Nantong – Ningbo | Nantong–Suzhou–Jiaxing–Ningbo high-speed railway 通苏嘉甬高铁 by way of Suzhou and Jiaxing, crossing Hangzhou Bay; today's trains run by way of Shanghai and Hangzhou | 310 by its source | 350 | – | under construction (Xinhua, 14 Oct 2026; NDRC, 17 Jan 2023) |
| Ningbo – Fuzhou | Hangzhou–Shenzhen railway 杭深线 the older coastal line; 300 km/h only Hangzhou–Ningbo | 570 | 200 | 2009–2013 the whole line's years | open (Wikipedia) |
| Wenzhou – Fuzhou second line | Wenzhou–Fuzhou high-speed railway 温福高铁 a second, faster line beside the Hangzhou–Shenzhen railway; begun September 2025 | 302 by its source | 350 | – | under construction (Fujian Provincial Government, 29 Sep 2025) |
| Fuzhou – Xiamen | Ningbo–Guangzhou high-speed railway 甬广高速线 the Fuzhou–Xiamen section opened under the Ningbo–Guangzhou name | 231 | 350 | 2023 | open (OpenStreetMap, start_date of the track) |
| Xiamen – Shenzhen | Hangzhou–Shenzhen railway 杭深线 | 513 | 250 | 2013 | open (OpenStreetMap, start_date of the track) |
| Shenzhen – Jiangmen | Shenzhen–Jiangmen railway 深江铁路 under the Pearl River estuary | 116 by its source | 350 | – | under construction (Xinhua, 6 Jan 2026) |
| Jiangmen – Zhanjiang | Shenzhen–Zhanjiang railway 深湛线 | 354 | 200 | 2013–2018 | open (Wikidata, 深湛铁路 (date of official opening); OpenStreetMap, start_date of the track (extract of October 2026)) |
| Zhanjiang – Hepu | Hepu–Zhanjiang high-speed railway 合湛高铁 | 139 by its source | 350 | – | under construction (Xinhua, 15 May 2026) |
| Hepu – Beihai | Nanning–Beihai railway 邕北线 the last stretch of the Nanning–Beihai line; not measured | – | 250 | 2013 | open (People's Daily, 28 Dec 2013) |
| Beihai – Fangchenggang branch | Qinzhou–Fangchenggang railway 钦防线 by way of Qinzhou on the Nanning–Beihai line, then the Qinzhou–Fangchenggang line | 61 | 250 | 2013 | open (People's Daily, 28 Dec 2013) |
Hub cities along the corridor
The atlas's hub cities the plan names and those on the corridor's open lines, in order along it; a city the plan names is listed even where the stretch to it is not yet built.
Where does the Coastal corridor run?
From Dalian (Dandong) to Beihai (Fangchenggang): in the 2016 plan it runs Dalian (Dandong)–Qinhuangdao–Tianjin–Dongying–Weifang–Qingdao (Yantai)–Lianyungang–Yancheng–Nantong–Shanghai–Ningbo–Fuzhou–Xiamen–Shenzhen–Zhanjiang–Beihai (Fangchenggang).
How much of the Coastal corridor is open?
13 of its 19 sections are open: 3,350 km of track in OpenStreetMap (1 open stretch not measured); 5 under construction; 1 with no report found.
Which lines make up the Coastal corridor?
Dandong–Dalian railway, Tianjin–Qinhuangdao high-speed railway, Jinan–Qingdao high-speed railway, Weifang–Yantai high-speed railway, Qingdao–Yancheng railway, Yancheng–Nantong high-speed railway, Shanghai–Suzhou–Nantong railway, Hangzhou–Shenzhen railway, Ningbo–Guangzhou high-speed railway, Shenzhen–Zhanjiang railway, Nanning–Beihai railway and Qinzhou–Fangchenggang railway. Still to come: Tianjin–Weifang high-speed railway (under construction), Nantong–Suzhou–Jiaxing–Ningbo high-speed railway (under construction), Wenzhou–Fuzhou high-speed railway (under construction), Shenzhen–Jiangmen railway (under construction) and Hepu–Zhanjiang high-speed railway (under construction).
More
- All sixteen corridors of the 8+8 grid, and every line with a page.
- The China high-speed rail map: every line, the fastest train from any of 224 cities, and SVG and PNG downloads.
Sources: the corridors, their city strings, branches and the lines the plan keeps at lower speeds are from the Medium- and Long-Term Railway Network Plan (中长期铁路网规划, 发改基础〔2016〕1536号), National Development and Reform Commission, Ministry of Transport and China Railway Corporation, 13 July 2016, quoted as printed. Lines, their lengths and the stretches drawn are from OpenStreetMap (© OpenStreetMap contributors, ODbL; extract of October 2026), measured along the track that carries each line's operating name; a stretch not measured is left out of the open total, and a line not in the data is counted apart, at the length its source gives. Opening years, construction and plans are from the sources given in the table; a stretch with no report found shows no status.
Cite this page
- APA
- Atlas of China. (2026, October 31). Coastal corridor: lines, cities and what is open. https://www.atlasofchina.com/maps/corridors/coastal/
- MLA
- “Coastal corridor: lines, cities and what is open.” Atlas of China, 31 Oct. 2026, www.atlasofchina.com/maps/corridors/coastal/.